Click on the images to enlarge
Installing the capital
Raising the capital
One person can lift our capitals
Setting the capital on the column
Preparing the column
Preparing the base
Four people to complete project
The column is lowered
The same is done on the opposite side
The column shaft is lowered
Entire column is being slid over a structural post. The base is installed at the same time.
The first column is installed
Both columns installed
Finished courthouse installation